flow changes

  • Power and gas networks

    Forced imports: VIC-NSW interconnector summer moonwalk?

    A lot has been written recently about how the energy transition is lagging behind the required installed capacity needed to deliver on our net-zero future. We also know that the connection of new generation requires significant investment into additional transmission infrastructure (or other non-network solutions) and that this needs to...