Issue 555 | TNUoS draft 2016-17

Issue 555 | TNUoS draft 2016-17

Josephine Lord Josephine Lord Consultant

Transmission Use of System ChargesDraft 2016-17 TNUoS tariffs 22 December 2015 National Grid issued draft transmission network use of system (TNUoS) tariffs for 2016-17 on 21 December. Average generation charges have increased by £0.13/kW since the previous forecast in November, mainly due to the 1.2GW reduction in chargeable generation. The generator residual is forecast to be £0.49/kW, which is £0.17/kW higher than the previous forecast and compares to a 2015-16 figure of £4.81/kW. Demand forecasts have been revised with forecasts for peak, half hourly (HH) and non-half hourly (NHH) demand down by around 4% due to growth in embedded generation. ...

This is a subscription product

If you are a subscriber please log in



For more information or to subscribe
please contact us