Loading...

Helping you make sense of the energy and water sectors

Market research & Insight

Issue 771 | Code Administrator Consultation: CMP250 Stabilising BSUoS With at Least a Twelve Month Notification Period

Issue 771 | Code Administrator Consultation: CMP250 Stabilising BSUoS With at Least a Twelve Month Notification Period

Rowan  Hazell Rowan Hazell Analyst

Code Administrator Consultation: CMP250 Stabilising BSUoS With at Least a Twelve Month Notification Period 1 December 2017 Headline Assessment 1 Assessment & recommendation The code administrator consultation for CMP250 Stabilising BSUoS with at Least a Twelve Month Notice Period was issued on 24 November. The modification, originally proposed by Drax Power, is seeking to fix the value of the Balancing Services Use of System (BSUoS) Charge over the course of a season, now proposed as 12 months long, with a 12-month notice period ahead of the charging season. It was put forward in response to the increasing volatility and unpredictability of the BSUoS charge, which ...

This is a subscription product

Already a customer?



To keep reading, contact us to request
a sample and discuss your requirements

Who we work for