Loading...

Services
About Us

Helping you make sense of the energy and water sectors

Market research & Insight

Issue 615 | CUSC

Issue 615 | CUSC

Connection and Use of System Code (CUSC) Working Groups CMP264 and CMP265 4 July 2016 Headlines National Grid presented on the Transmission Network Use of System (TNUoS) money flows. It was shown that embedded generators cause an additional cash flow from suppliers to embedded generators. First Hydro presented on the effects of adding 100MW capacity of either transmission, embedded, on site or Demand Side Response (DSR) in the same Grid Supply Point (GSP) region. The highest cost to consumers results from connecting additional embedded generation as this reduces the transmission demand charging base. Implications of both change proposals were revisited. The change ...

This is a subscription product

Already a customer?

Log in

To keep reading, contact us to request
a sample and discuss your requirements

Sign-up to our mailing list
to receive updates from Cornwall Insight.

Who we work for