Energy Market Alerts provide latest updates in a complex market

Cornwall Insight Australia summarises all the essential facts in our Energy Market Alerts, designed to keep you up to date with all the latest developments in the market. The energy market is changing so fast that our Alerts will ensure you have the facts to hand when you need them. If you’re interested in receiving a sample Energy Market Alert for free, contact us here.

List of policy and regulatory alerts produced by Cornwall Insight Australia (2020-present)

2022 policy and regulatory Alerts produced by Cornwall Insight Australia
Changes to MTPASA process (final determination)
ESB Electric Vehicle Smart Charging Issues Paper
Victorian Transmission Investment Framework consultation
TNSPs recovery of AEMO participant fees
NSW renewable draft tender pack
ESB T-3 State ministerial trigger for RRO (Consultation and initial rules)
ERC0347 Amending the administered price cap (Consultation paper)
NSW Electricity Roadmap (Tender round 1 draft guidelines)
Energy Ministers’ meeting communique (reform agenda)
Victoria’s Gas Substitution Roadmap (Final)
AEMC Transmission planning and investment (Contestability)​
AEMO 2022 Integrated System Plan​
ESB Transmission Access Reform (Consultation paper)​
Amendments to the Interim Reliability Reserve (Consultation paper )
Efficient reactive current access standards for inverter-based resources (Consultation paper)
Availability in MT PASA (Draft determination)
Energy Ministers (Communique)
AEMC REL0084 Frequency Operating Standard (Review paper)
Amendments to AEMO instruments for Efficient Management of System Strength Rule (Request for feedback)
AEMO NEM2025 Implementation Roadmap (Information paper)
EMO0042 Review into extending the regulatory frameworks to hydrogen and renewable gases
Central West Orana (CWO) REZ Access Standards (Draft paper)
Vic Gov Offshore wind (Policy direction paper)
AEMC ERC0338 Enhancing information on availability in MT PASA (Initiation)
ESB Capacity Mechanism (Project Initiation Paper)
NSW Gov Renewable Energy Zone (REZ) Rights & Design scheme: Central West Orana (CWO) (design)
Infrastructure Investment Objectives (IIO Report)
AEMC ERC0280 Integrating storage into the NEM (Final determination) 
AEMC ERC0300 Efficient management of system strength (Final determination)
2021 policy and regulatory Alerts produced by Cornwall Insight Australia
ESB Transmission Access Reform (Initiation)
QLDgov QLD REZ development model (Technical paper)
AEMC ERC0256 Generator registrations and connections (Final determination)
Fed Gov Long Term Emission Reduction Plan
EMO0042 GRC0062 Review into extending regulatory frameworks to hydrogen and renewable gases
NSW Gov Electricity Infrastructure Safeguard Policy paper
AEMC ERC0263 PFR incentive arrangements (Draft determination)
AEMC ERC0306 ERC090 CCM and SSM (Directions paper)
AEMC EPR0087 & ERC0325 Transmission Planning and Investment Review (Consultation paper)
ERC0311 Access pricing and incentive arrangements for DER (Final determination)
ESB Post 2025 Market Design (Final determination)
NSW Electricity Infrastructure Roadmap: Long Term Energy Service Agreements (Consultation)
AEMC ERC0280 Integrating storage into the NEM (Draft determination)
AEMC ERC0296 Fast Frequency Response (Final determination)
AEMC ERC0294 Connection to dedicated connection assets (Final determination)
AEMC ERC0256 (consolidated with ERC0318) Generator registrations and connections (Draft determination)
AEMC ERC0326 ERC0327 NEM Settlement under low, zero, and negative demand conditions (Determination)
ESB Post 2025 Market Design April 2021 (Options paper)
AEMC ERC0296 Fast Frequency Response (Draft determination)
AEMC ERC0300 Efficient management of system strength (Draft determination)
ERC0311 Access pricing and incentive arrangements for distributed energy resources
NSW Gov Central West Orana Renewable Energy Zone Access Scheme (Issues paper)
AEMC RRC0036 Bill contents and billing requirements (Final determination)
VicGovt REZ Development Plan (Directions paper)
AEMC ERC0313 Semi-scheduled generator dispatch obligations (Final determination)
AEMC ERC0325 Material change in network infrastructure project cost (Rule change request)
AEMC ERC0326 & ERC0327 NEM settlement under low, zero, and negative demand conditions
AEMC ERC0295 ERC0307  Reserve services in the NEM (Directions paper)
AEMC ERC0263 Primary Frequency Response Incentive Arrangements (Directions paper)
AEMC ERC0296 Fast Frequency Response (Directions paper)
AEMC ERC0280 Integrating storage into the NEM (Options paper)
AEMC ERC0313 Semi-scheduled generator dispatch obligations (Draft determination)
2020 policy and regulatory Alerts produced by Cornwall Insight Australia
AEMC ERC0320 Participant derogation financeability of ISP projects (Initiation)
AEMC ERC0256 Generator registrations and connections (Initiation)
AEMC ERC0287 Compensation following directions for services other than energy and market ancillary services (Draft determination)
AEMC RRC0036 Bill contents and billing requirements (Draft determination)
AEMC GRC0058 DWGM maintenance planning (Initiation)
AEMC RPR0015 RoLR scheme Consultation paper (Review)
ERC0291 Removal of intervention hierarchy (Final determination)
ERC0289 Changes to intervention mechanisms (Final determination)
ERC0280 Integrating storage into the NEM (Initiation)
ERC0312 Simplification of NER definitions (Initiation)
EPR00682 Simplification of NER definitions (Initiation)
ERC0316 Reallocation of national transmission planner costs
ERC0309 DER integration, updating regulatory  arrangements (ERC0309, ERC0310, ERC0311)
ERC0306 Capacity commitment mechanism for system security and reliability services (Initiation)
ERC0307 Introduction to ramping services (Initiation)
ERC0296 Fast frequency response market ancillary service
ERC0290 Synchronous Services Markets (Initiation)
ERC0295 Operating Reserve Market (Initiation)
ERC0300 Efficient management system strength on the power system (Initiation)
ERC0291 Removal of intervention hierarchy (Draft determination)
ERC0284 Compensation for market participants affected by intervention events (Initiation)
ERC0287 Compensation following directions services other energy and ancillary services (Initiation)
ERC0289 Changes to intervention mechanisms (Draft determination)
ERC0298 Delayed implementation of five-minute and global settlement
ERC0247 Wholesale demand response mechanism (Final determination)
ERC0300 Efficient management of system strength (Rule change request)
ESB Two-Sided Market (Consultation paper)
ESB System services and Ahead Markets (Consultation paper)
ERC0296 Fast frequency response market ancillary service
ERC0278 System restart services (Final determination)
EPR0076 System strength framework review (Discussion paper)
ERC0295 Operating Reserve Market (Rule change request)
ERC0283 Victorian RERT derogation (Final determination)
ERC0274 Mandatory Primary Frequency Response (Final determination)
Legislation National Electricity (Victoria) Amendment Bill 2020
ERC0247 Wholesale demand response mechanism (Draft determination)
ERC0251 Transmission loss factors (Final determination)
ERC0270 Improving transparency and extending duration of MT PASA (Final determination)
ERC0274 Mandatory Primary Frequency Response (Draft determination)

Related thinking

Announcement

Australian FCAS power price trends

This report provides power price trends for the technology enablement as a percentage of total market share, using outputs from Cornwall Insight Australia’s latest Frequency Control Ancillary Service price curve (FCAS), published on 30 August 2022. We hope this information is of value-add to you and your business. Please don't...

Announcement

2021/22 Australian energy insights report

Analytics on key current developments in the Australian energy industry are available Cornwall Insight Australia has released a compilation of Australian energy insights, charts, and analyses. The report includes the topics of energy storage and flexibility, generation (all technologies), power prices, low carbon generation, FCAS, policy and regulation, and transmission...

Announcement

Free one-month trial of a forum

Would you like to attend one of our forums for free? We’re offering a one-month free trial for new members to attend. Cornwall Insight hosts several forums spanning key areas of the energy value chain. Our forums allow you the opportunity to talk to our experts and hear their thoughts...

Commercial and market outlook

Editor’s Pick | Jump start: accelerating net zero commitments

With the World Economic Forum (WEF) Annual Meeting having just taken place on 21-24 January, there has been increased focus on global sustainability. In this Perspective, we take stock of the countries and companies that are accelerating net zero commitments a decade or more ahead of the widely held 2050...

Commercial and market outlook

Editor’s Pick | AEMC takes forward system resilience measures

The Australian Energy Market Commission (AEMC) issued its final report on 12 December following a black system event, setting out recommendations on measures to enhance the resilience of the power system. On 28 September 2016, there was a black system event in which around 850,000 South Australia customers lost electricity...

Commercial and market outlook

AEMO: new markets & standards to help integrate renewables

The below sample has been taken from our second edition of Energy Spectrum Australia, and if you have enjoyed reading this article and want to read more about the latest developments in the Australian energy market, please contact Ben Hall, b.hall@cornwall-insight.com,  for more information. On 1 October AEMO published an...

Commercial and market outlook

Editor’s Pick | AEMC progresses five-minute and settlement reforms

Australia’s Energy Market Commission (AEMC) has approved changes to the National Electricity Rules which will improve wholesale market operations under five-minute settlement and rationalise settlement arrangements. The determination issued on 8 August supports the AEMC’s decisions in November 2017 to align operational dispatch and financial settlement at five minutes and...

Home supply and services

Editor’s Pick | Australia’s Retailer Reliability Obligation implemented

A new mechanism to support energy system reliability came into effect on 1 July in Australia’s National Electricity Market (NEM). The Retailer Reliability Obligation (RRO), if triggered, requires suppliers and some large energy users to hold contracts with or invest directly in generation or demand response. It has been introduced...