Do batteries add viability to electrolysers within the current market?

Last month, the Australian Competition and Consumer Commission (ACCC) announced that there will be a gas shortfall in the east coast market in 2023, not a surprise considering the international gas crisis and high gas prices in Australia. Such events have increased attention towards expanding gas supply or reducing the gas demand in Australia and worldwide.

One well-known alternative for reducing natural gas demand is hydrogen. In this regard, polymer electrolyte membrane (PEM) electrolysers are expected to become an important part of hydrogen production in Australia. PEM electrolysers consume electricity to produce hydrogen.

Although PEM electrolysers are on the top of the list regarding hydrogen production, they are subject to an operational limitation: the price of electricity they consume. This means the employment of PEM electrolysers can quickly become non-viable if the electricity prices are high. To reduce this risk and increase “green” credentials, PEM electrolysers can be coupled with renewable energy sources and/or a battery energy storage system (BESS). However, adding a renewable generator or a BESS to a PEM electrolyser business case increases the project’s capital expenditure.

In this Chart of the week, we investigate if a BESS can add viability to a PEM electrolyser by levelling its exposure to high electricity prices during the day.

We have conducted a simulation where an electrolyser with 10MW of electricity consumption is coupled with a BESS, both connected to the grid. The analysis uses electrolyser costs similar to AEMO’s 2020 ISP FY22 capital cost of $3500/kW and an estimated project lifetime of 20 years. The operation cost includes the maintenance cost, and the cost of electricity with the electrolyser assumed to run at an 80% capacity factor (which has not been finely optimised on pricing vs capex). Electrolyser’s efficiency is 73% (54 kWh/kg H2), and the WACC has been considered at 10%.

The levelized cost of hydrogen (LCOH) has been given in the chart for different BESS capacities (MW) and BESS capital costs ($/KW). The cost of BESS has been considered in a range from $1521/kW (including registration fees) to $400/kW to reflect the future changes in BESS capital costs.

As is seen in the chart, with the current capital cost of BESS and the electricity prices in the NEM, a BESS cannot add viability to the PEM electrolyser (see green bars). The reason is that while a BESS can reduce the electrolyser’s exposure to high prices, the BESS capital expenditure results in higher values of LCOH. Note that this only shows the LCOH for a BESS coupled with a PEM electrolyser (a large load to be supplied by the grid and possibly the BESS) and DOES NOT mean that a standalone BESS is an infeasible project on its own.

Assuming the cost of BESS is reduced to 600-400 $/kW (forecasted in 2040-2050), a BESS coupled with a PEM electrolyser is more viable than a standalone PEM electrolyser. This is shown with the dark navy bars in the chart.

To conclude, a BESS can add viability to a PEM electrolyser and can reduce the LCOH, but this is only true if the capital cost of BESS considerably reduces to $900/kW for large-scale BESS (almost 100MW) and to 600-400 $/kW for smaller sizes. The size of the BESS is of importance here as the bigger the BESS, the less exposure to high prices by the electrolyser (let’s not forget that the electricity price is an important element in determining the LCOH).

It should also be noted that the cost of electrolyser is also projected to reduce to almost $1000/kW post-2030. However, this does not reduce the LCOH as we may expect, but the $2/kg hydrogen is not a dream if the electricity prices cooperate too.

In this study, we benefited from our benchmark price curves which provide a high-resolution forecast of electricity prices in the NEM to 2050. For more information on our benchmark price curves, please contact us at enquiries@cornwall-insight.com.au.

To keep reading, please log in to your account

Related thinking

Energy storage and flexibility

R1 and L1 revving up the BESS revenues

In our ‘The VFF… Very Fast and Financially rewarding market so far’ Chart of the week, the two new contingency markets, the Very Fast raise contingency FCAS market and the Very Fast lower contingency FCAS, were analysed and demonstrated the high participation of big batteries along with VPPs and DERs....

Low carbon generation

An investigation into REZ capacity factors during Victoria’s dark doldrums

As the grid transitions to much higher levels of renewable penetration, the range of generation outcomes on any given day increases. The worst of these ranges are known as dark doldrums when there is a combination of poor conditions for wind and solar generation, usually a windless day in winter....

Commercial and market outlook

The VFF… Very Fast and Financially rewarding market so far

On 9 October 2023, 1pm (market time), we saw the start of two new contingency FCAS markets. The Very fast raise contingency FCAS market, and the Very fast lower contingency FCAS. Upon commencement of the VF FCAS market, a commissioning period of two weeks with an initial max requirement of...

Commercial and market outlook

Is the sun setting on utility solar?

The Federal Government has legislated emissions reductions of 43% below 2005 levels by 2030. Sourcing electricity from renewable technologies is fundamental to meeting this, with a much-publicised target of 82% renewables in the grid by 2030 – up from a current value of 38% over the last year. Fortunately, the...

Commercial and market outlook

The Very Fast FCAS market is about to commence – a look at a possible time-of-day profile for R1

On 9 October 2023, 1pm (market time), the dispatch of the new Very Fast (VF) FCAS market in the NEM will commence and will add two new markets for contingency FCAS, Raise 1 (R1) and Lower 1 (L1). AEMO has released a final industry go-live plan to keep track of...

Low carbon generation

“Ooh, a storm is threatening, My very [interconnection] today”: Can states utilise interconnection to share wind resources?

Penetration of renewables continues to dominate the energy news, as we saw renewables as a proportion of total demand reach new heights this week to a new record of ~70% penetration. In light of this continuing march toward a renewable-dominated grid (building on some analysis we did in Chart of...

Energy storage and flexibility

How long is the ‘Golden time of day’ for batteries?

A key part of the business case for grid-scale standalone batteries is the arbitrage opportunity between low daytime wholesale prices (when renewable energy generation from solar is plentiful) and high evening prices (when the sun goes down and household demand ramps up quickly). The share of battery revenue coming from...

Low carbon generation

MLF changes in NSW in the past decade

MLF, short for Marginal Loss Factor, represents the portion of electricity losses that occur along the transmission network between a connection point and the Regional Reference Node (RRN). Within the NEM, the MLF serves as a metric to quantify these losses along the network, playing a pivotal role in determining...