Elevated Wholesale Price in the NEM: QLD on the verge of triggering Administered Price Cap (APC) again

The Administered Price Cap (APC) was triggered for the first state on 12 June at 6:55 am as a result of QLD breaching the Cumulative Price Threshold (CPT) of $1,359,100 for the rolling 7-day period. This caused the withdrawal of capacities by gas generators that could not recover fuel costs with the APC of $300/MWh.

The previous Chart of the Week shows that the bidding strategy of gas generators has changed significantly. These changes are expected to remain in the short to medium term, meaning that average prices in the NEM will likely remain above $300/MWh if gas is required. The question is whether NEM is out of the woods now, or is there still a chance for market suspension based on the current regulations? To answer this, we have analysed the recent market data to investigate the market conditions after the suspension.

The following chart shows the 7-day rolling cumulative price for each region (lines) along with the daily solar and wind generations (bars) in QLD since 8 June 2022.

July 4-6: QLD was on the verge of triggering APC again

The cumulative price after the market suspension has been reduced, but interestingly, from 4 July, the cumulative price (CP) in QLD increased significantly and subsequentially reached a maximum of $1,331,162 on 6 July at 2:35 am, which is just under the threshold (noting the CPT rose slightly on 11 July to $1,398,100, with the market price cap also rising to $15,500/MWh). This means that only less than 30 minutes (6 dispatch intervals) of high price periods (>$10,000/MWh) would have resulted in the APC being triggered in QLD, potentially resulting in the same sequence of events that led to the market suspension in June.

The pre-dispatch sensitivity data shows that if the demand in QLD was 200 MW higher over the 5 July evening peak, the price could have been ~$5000/MWh instead of ~$450/MWh. This would have been enough to increase the CP to breach the CPT the next day at 2:30 am.

The driver for the spike in QLD price from 4 to 6 July was a sudden reduction in wind and solar generation in this region, which saw a drop from 10 GWh in previous days to less than 4 GWh. Furthermore, the average temperature decreased by ~3°C on 4 July across QLD, which increased the peak demand by 16% (8.6GW vs 7.4GW) compared to previous days. The combination of decreased renewable generation and the increased demand resulted in the higher bid gas generation coming online and causing the price to reach extremely high levels (>$10,000/MWh), particularly during the evening peak. This significantly ramped up the CP in QLD, such that it reached close to the CPT in the following 48 hours.

Luckily, there was a reduction in demand and an increase in renewable generation on 6 July, reducing the spot price and cumulative price in the following days. The historical pre-dispatch sensitivity data shows that in some instances during 4-6 July, an additional 500MW of lower cost generation, or less demand, could have reduced the price by a factor of 10 ($500/MWh instead of $5000/MWh), significantly lowering the price spikes and the CP. That 500MW could have been provided if there was enough installed storage capacity and/or demand response in QLD.

NEM outlook

Considering gas prices are likely to remain at high or even similar levels for the next 1-2 years, and the recent announcement by AEMO regarding the current shortage of gas reserve levels in VIC, the re-occurrence of price spikes and high CP is likely in the future. As the historical data shows, these price spikes could drive CP close to CPT in a short period of time, and the CP in NSW recently exceeded 1,000,000 (i.e. average price higher than $500/MWh). Therefore, it is worth monitoring how the change in the bidding strategy of gas generators will impact the market for the rest of the winter.

It is crucial that such events, which have high impacts, be taken into account when designing the market and the power system. For relatively short-duration events, such as the 2-3 days of reduced renewables in early July, short/medium duration storage (e.g., batteries) could mitigate the situation by load shifting the peak periods and providing additional security. However, for longer-lasting events, there is a need for long-duration storage technologies or more dispatchable generators.

With the 2022 ISP now released, there is a target for increasing penetration of renewables in the power system. As such, the question is now: Do we design the market and power system to be able to navigate a 1 in a 20-year event without intervention? Or is it preferable for the system operator to intervene and drive the market manually in extreme events?

For more information on how these dynamics may impact future NEM price dynamics, our Benchmark Power Curve has been recently released. If you would like further information, please contact us at enquiries@cornwall-insight.com.au.  

To keep reading, please log in to your account or sign up for free

Alternatively, please sign up to receive free market insight online and direct to your inbox

Related thinking

Commercial and market outlook

How does thermal storage stack up compared to batteries?

Along with the retirement of coal/gas power plants in the NEM, long-duration energy storage systems (LDESS), often exceeding 8 hours of storage, are becoming more crucial in transitioning to a more sustainable and renewable energy future. LDESS technologies, such as battery storage systems (BESS), thermal energy storage systems (TESS), compressed...

Commercial and market outlook

VNI West selected path; an incentive for delaying coal retirements?

On 29 May 2023, AEMO published a conclusions report on the VNI West Project. According to the report, option 5A (a variant of  AEMO’s preferred option in a previous consultation paper) is preferred for VNI West. In option 5A, the transmission line crosses the Murray River north of Kerang (Wamba...

Commercial and market outlook

Spot the spread: Are current battery revenues enough to encourage further investment?

In AEMO’s ‘Step Change’ scenario, it was estimated that storage capacity in the NEM would need to increase by a factor of 30 between 2022 and 2050 to support a grid transformation that limits temperature rises below 2 degrees. This represents about 13GW of new storage capacity by 2030 and...

Power and gas networks

Trouble Ahead? – What’s Next For TNUoS Charges?

Some industry participants will be well versed in the Transmission Network Use of System (TNUoS) charging regime, while others may not have had to engage with it before. Regardless of previous involvement, these charges are becoming increasingly important to understand for reasons we will discuss shortly.  In this week’s ‘Chart...

Commercial and market outlook

Feast or famine? FCAS costs in South Australia

Frequency Control Ancillary Service (FCAS) prices are highly volatile, at times resulting in short periods of extremely high FCAS cost. Three such events in recent history are the South Australian (SA) islanding events in November 2019, February 2020, and November 2022. During these events, FCAS costs in SA totalled $16...

Low carbon generation

NSW’s transition to a new era: What will replace Eraring?

After 52 years of operation, the NSW Liddell power station officially shut down last 28 April. With Liddell’s closure, NSW’s transition to a green energy future is in full swing. First announced in 2015, NSW had seven years to ensure there is enough replacement capacity once Liddell is retired. Since...

Commercial and market outlook

It’s the Liddell things that matter

Australia’s oldest coal-fired power plant Liddell retired completely in the last week of April 2023 after 52 years. This giant of AGL, which had a total registered capacity of 2,000 MW, operationally acted as a 1600MW station and 1200MW after the closure of its third unit. Australia’s transition to clean...

Energy storage and flexibility

A look at AEMO pre-dispatch forecasts over the last year

The Energy Security Board (ESB), under the direction of the National Cabinet, is currently working on a number of changes that will impact how generators connect to and operate within the National Electricity Market (NEM). The Congestion Relief Market (CRM) model is one such change to how the NEM currently...