There is a light that never goes out: T-4 CRM qualification

On 8 March the summary qualification results for the upcoming 2022/23 T-4 capacity auction were released, breaking down those qualified to bid by technology type. As previously noted, this auction is an important one as it will give an indication of the new capacity seeking to connect to the Irish system during a period when a significant volume of thermal assets is scheduled to close.

As bidders consider their strategy for next week, our blog this week considers what these qualification results tell us. 

Related thinking

Low carbon generation

PSO Levy 2022/23: RESS to the Rescue

This week we look at how renewable generation is putting money back in consumers’ pockets - a trend which, based on the power price forecast from our All-Island Forward Curve report, is expected to continue until 2027. Last week the Commission for Regulation of Utilities (CRU) published their final decision...

Energy storage and flexibility

System operators warn of System Alerts risk this winter

EirGrid and SONI issued their Winter Outlook for 2020-21 on 15 October in which they warned that if high generator forced outage rates continue over the winter period there is a risk of System Alerts. The transmission system operators (TSOs) said the all-island capacity margin this winter is predicted to be 929MW...

Low carbon generation

New policy measures needed to drive renewable generation

Published on 24 August, a new report by Energy Storage Ireland and the Irish Wind Energy Association (IWEA) called for action to strengthen Ireland’s electricity grid. The second of a series of four studies which make up the government’s 70 by 30 Implementation Plan, Saving Power outlines how to minimise dispatch down and increase the use...

Low carbon generation

All-Island wind dispatch-down rises year-on-year

On 17 September, EirGrid published its Annual Renewable Energy Constraint and Curtailment Report 2019 which sets out the amount of wind and, for the first time, solar energy, that is available but cannot be used by the system (i.e. the dispatch-down of energy). Overall, the dispatch-down of energy from wind in Ireland...

Energy storage and flexibility

EirGrid and SONI assess future demand and generation landscape

Transmission system operators (TSOs) EirGrid and SONI have issued the All-Island Generation Capacity Statement 2020-29 that sets out expected electricity demand together with the level of generation capacity that will be required over the next ten years.  Issued on 27 August, the Statement said RoI demand is increasing, and is forecast...

Energy storage and flexibility

CRU implements COVID-19 supply suspension scheme

On 1 May, the CRU set out the details of its decision to implement a temporary supply suspension scheme for eligible SME electricity and gas customers due to the impact of the pandemic. It said that the unique and extraordinary circumstances of the current situation require a modification to the current approach...

Low carbon generation

RESS-1 application closing date is further extended

With a lot of uncertainty around the impacts of COVID-19 on global supply chains and renewable project delivery we are starting to see the effects in the Irish Energy market, notably the announcement that prequalification for the Renewable Energy Support Scheme in Ireland will be extended. In December 2019, the...

Energy storage and flexibility

Changes: Demand falling in SEM

With the unexpected arrival of coronavirus there has been significant a shift in human behaviour. We are now two weeks removed from the Irish Government’s instruction to close schools and message advising businesses to allow employees work from home where possible, we wonder what has the impact been on energy...