High Voltage Direct Current

  • Power and gas networks

    New Fault Ride Through compliance arrangements introduced for transmission-connected generators

    Ofgem approved Workgroup Alternative Grid Code Modification 1 (WAGCM1) of GC0151 Grid Code Compliance with Fault Ride Through (FRT) Requirements on 5 November. In short, this decision introduces a new, legal process, into the Grid Code – the legal text that governs those connecting to the electricity transmission system -...